- Home
- Departments
- Engineering and Traffic
- Capital Projects
Capital Projects
The Engineering Department is implementing projects from the 2008-2012 Capital Improvement Program in the area of public infrastructure (roads, utilities and drainage). The ever-increasing challenges of our growing, thriving community have necessitated improvements in all categories.
Jump to:
Jump to:
Road Projects
Allen Drive/US 75 Interchange Improvements
|
Alma and Ridgeview Drive Roadway Improvements
|
Buckingham Lane and Highpoint Drive Asphalt Rehabilitation
|
2022 Streets and Alleys Rehabilitation
|
Traffic Signal Design and Construction
|
TXDOT Project - FM 2551/Angel Parkway
|
TXDOT Project - US 75 at Ridgeview Drive Overpass
|
TXDOT Project - US 75 Peak Hour Lane/High Mast Illumination
|
DART Rail Service
|
Utilities/Drainage Projects
Windridge Water/Sanitary Sewer Rehabilitation (Phase 2)
|
24-Inch Sloan Creek Waterline
|
Sloan Creek Trunk Sewer and Lift Station
|
Advanced Meter Infrastructure (AMI) - Development Services
|
Stacy Pump Station Rehabilitation
|
Manhole Investigation and Rehabilitation (Watters Creek and Cabela's)
|
Bank Stabilization Project
|
City Facility Projects
Allen Fire Station #6
|
Don Rodenbaugh Natatorium HVAC Replacement (Phase 2)
|
Allen Police Department Headquarters: Parking Lot Fence
|
Allen Police Department Headquarters: Air Handler
|
-
Engineering and Traffic
Physical Address
305 Century Parkway
Allen City Hall, First Floor
Allen, TX 75013
Phone: 214.509.4576Fax: 214.509.4590
Business Hours
Mon-Fri: 8 a.m. to 5 p.m.